Monday, November 14, 2022

Another productive weekend

The past long weekend was used to finish our work in the flat at the coast. Now all the stuff is divided in two parts: the things that go to the container park (last weekend of November) and those (boxed) which need to be taken home (next Sunday).

My sister's co-worker offered to help us moving these boxes. He has a pickup truck which is roomy enough to stow all the different boxes and packs of clothing. We also need to take along two relax chairs which we used to sun into. 

The only problem is where to put all the stuff once it arrives in Dendermonde. The objective is that everything will get a place, but before that we need to make some major changes in the downstairs of the house. The interior will be completely changed. These things need time. Nowadays, it has become difficult to obtain certain materials. For instance, for high-end isolating glass in windows you need to wait at least 6 months. The other renovations have to wait until the new doors and windows have been placed. Then will probably come isolation of the outer walls, then a renovation of the bathroom. Later on, it will depend on the pricing what can also be done. Sun panels would be great, and a new floor in the living room. We'll see what will be possible!


No comments:

Post a Comment